The project consisted of the design of approximately 1,324 feet of 42” PVC, 432 feet of 42” DI, and 930 feet of 8” PVC sewer line and 375 feet of 36” existing sewer pipe lined by CIPP process. The project construction area was located in downtown Lexington.  The project provides sewer service for much of downtown Lexington including the UK Campus and Rupp Arena. The 42” sewer is one of Lexington’s main trunk sewer lines.

 

UK Trunk A2UK Trunk A3UK Trunk A5