City of Bonnieville, KY

The planning and design of a wastewater collection system.  The waste will be pumped to the Caveland Sewer Authority’s existing system.  Several alternatives were evaluated for cost effectiveness.  The project consisted of approximately 12,000 LF of 8″ gravity sewers and 50,000 LF of 8″ force main with two duplex pump stations.