Campbellsville Dam Reconstruction, Campbellsville, Kentucky

MSE was responsible for the design of modifications of the existing City dam including adding a new 60′ high, 3-bay spillway bridge, concrete spillway channel, stilling basin and stability berm for the dam which provides a crossing for the Kentucky Highway 55. A large ogee weir system was designed to control the pool elevation for a PMP event.