Stanford Harris Lake
Planning, design and construction management for a 640’ long and 72’ high earthen dam and a 38-acre reservoir for water supply for the City of Stanford. Spillways include a SCS type inlet with a 36” RCCP and 50’ wide emergency spillway. Also included were 2 Miles of 12″ waterline and a 1,000 gpm pump station to allow the James Harris Lake principal spillway outlet structure to be used as a water supply intake by the City of Stanford.