LILY INDUSTRIAL SITE, London, Kentucky – Master Planning of an 88-acre industrial site and assistance with the recruitment of Aisin Automotive (which took the entire 88 acres).  MSE Scope of Services also included Survey & Mapping; Environmental; Utility Service Planning and design; Design of turning lanes at the intersection of US 25 and State Hwy 552 and reconstruction of an existing curve; Design of a railroad crossing; Design of Emergency Road; Design of a 500,000 gallon elevated water storage tank; Planning and design of a 150,000-sq. ft. manufacturing facility for Aisin Automotive Casting; Planning and design of a 12-bedroom guesthouse; Planning and design of an Industrial Wastewater Pretreatment Plant ; Construction Inspection and Contract Administration; Preparation of CDBG Application for substantial off-site infrastructure